ATL's work scope included shop and field inspection and testing services for all structural steel (22,000 tons) fabrication, structural steel erection, structural steel painting, fireproofing, metal check installation and other related construction for the movable roof assembly of the baseball stadium. Inspection of all connections for the erection of all roof structural steel components. Inspection and documentation of all in-place welded connection, threaded connections, bolted connections, all metal roof deck installation including welded connections for conformance to applicable codes, plans, and specifications. Provided daily written reports, comprehensive tracking and monitoring of the progress and acceptance of all required structural connections associated with the steel erection. This was a fast track project involving fabrication shops in Portland Oregon, Tigaard Oregon, and Winnipeg, Manitoba Canada. ATL provided steel fabrication and inspection at all of these locations.